Maintenance of High-speed lines: Zaragoza-French border

    Maintenance of infrastructure, track, and trackside devices. Madrid-Zaragoza-Barcelona-French border High-speed Line. Scope: Montagut, Villafranca and Sant Feliú bases.

    Client: ADIF AV

    Amount: 52,685,814.44 euros

    Term: 4 Years

    Estimated completion date: 19 May 2018


    • Conservation of the geometric quality of the track
    • Conservation of the geometric quality and the state of the track devices
    • Surveillance and guarantee of the correct operation of the elements of the track superstructure
    • Maintenance of longitudinal and transversal drainage systems while in full operational status
    • Maintenance of line enclosures and fencing, including their anti-vandal security doors
    • Execution of the immediate corrective actions necessary in the event of an incident
    • Establishment of surveillance and preventive or corrective measures in case of storm alerts or other warnings
    • Provision of relief to trains with incidents and, especially, assistance to passenger trains that have suffered loss of tension or traction
    • Prevention against incidents
    • Performance of rabbit culling activities
    • Control of material stocks that are property of ADIF, intended for use as spare parts in tracks and track devices, which are located in the maintenance bases
    • Waste management
    • Maintenance of the track, track devices, and buildings located in the maintenance bases, including all the equipment